Train Simulator Classic 2024

Train Simulator Classic 2024

Not enough ratings
Peninsula Corridor Series
   
Award
Favorite
Favorited
Unfavorite
Description
Welcome to the Peninsula Corridor series. The first scenario will start in San Francisco as you will need to take some passenger coaches down to the Centralized Equipment Maintenance and Operations Facility (CEMOF) in San José. Most of the series will focus on freight service all over the route with the second scenario focusing on some early morning duties at Pier 80 and 96. Clock in and lets get busy.

---Series Info---
Scenario order:
1) Caltrain 915 to CEMOF - Part 1
2) Yard Work (UP 535)
3) Caltrain 915 to CEMOF - Part 2
4) Yard Work (UP 521)
5) Yard Work (UP 535) Part 2
6) Yard Work (UP 500)
7) UP 546 to South San Fran. Part 1
8) Yard Work (UP 500) Part 2
9) UP 546 to South San Fran. Part 2
10) Yard Work (UP 540)
11) Yard Work (UP 541)
12) Yard Work (UP 521) Part 2
13) UP 546 to South San Fran. Part 3
14) Yard Work (UP 535) Part 3
15) Yard Work (UP 558)
16) Yard Work (UP 551)
Items (16)
Caltrain 915 to CEMOF - Part 1
Created by RBJets
(Scenario #1 in series) Welcome to San Francisco on the Peninsula Corridor. On this early foggy morning you have been assigned to run a few coaches due for service down to the Centralized Equipment Maintenance and Operations Facility (CEMOF) in San José al...
Yard Work (UP 535)
Created by RBJets
(Scenario #2 in series) Foggy morning yard work is up next as you start your shift working Pier 80 and 96. You'll prep for a incoming container ship at Pier 80 then a load of aggregate over at Pier 96 will need to be taken to the south yard. Loco: EMD GP38...
Caltrain 915 to CEMOF - Part 2
Created by RBJets
(Scenario #3 in series) After the crew drop in south San Fran you continue the trip down to the Centralized Equipment Maintenance and Operations Facility (CEMOF) in San Jose. After you get to the shop your next work order will be waiting. Loco: EMD F40PH-2...
Yard Work (UP 521)
Created by RBJets
(Scenario #4 in series) You are now in control of UP 521 in the South San Francisco Yard. "Caltain 915 to CEMOF" is pulling out and then you can begin your first work order of the day. Loco: EMD GP38-2 UP - Difficulty: Easy - Length: 60 Mins Click on above...
Yard Work (UP 535) Part 2
Created by RBJets
(Scenario #5 in series) In "Yard Work (UP 535)" you completed the first page of your work order, now you'll need to take the southbound freight down to the South San Francisco Yard. You will also have some empties and some export stock to bring back to the...
Yard Work (UP 500)
Created by RBJets
(Scenario #6 in series) A little further down the line we go and you will be driving UP 500 in the Redwood City area. Tasks will be to take some empty Gondolas to a crew up in Palo Alto then on the way back you'll claim loaded stock that will be heading so...
UP 546 to South San Fran. - Part 1
Created by RBJets
(Scenario #7 in series) Now we'll move to the southern end of the route as you will be taking a Intermodal manifest that came out of Pajaro and is now heading up to the South San Francisco Yard. Dispatch will work to get you through busy everyday traffic a...
Yard Work (UP 500) Part 2
Created by RBJets
(Scenario #8 in series) The shunting duties in the Redwood City area continue. You'll need to run up and clear out stock at Redwood Cement and Chemical that will need added to a southbound manifest to Newhall. Loco: EMD GP38-2 UP - Difficulty: Easy - Lengt...
UP 546 to South San Fran. - Part 2
Created by RBJets
(Scenario #9 in series) We return to UP 546 heading to the South San Francisco Yard. Dispatch can get you as far as the Redwood area before clearing more passenger traffic around you. Loco: EMD GP38-2 UP - Difficulty: Easy - Length: 50 Mins Click on above ...
Yard Work (UP 540)
Created by RBJets
(Scenario #10 in series) UP 540 is working the south end of the route and they are heading to Bolsa for a quick drop before heading all the way down to Hollister to clear out empties that need returned to Gilroy. Loco: EMD GP38-2 UP - Difficulty: Easy - Le...
Yard Work (UP 541)
Created by RBJets
(Scenario #11 in series) You took UP 540 south down to Hollister to clear out empties and now you prepped 541 for the trip back to Gilroy where you'll break up and sort the cut of empties. Loco: EMD GP38-2 UP - Difficulty: Easy - Length: 60 Mins Click on a...
Yard Work (UP 521) Part 2
Created by RBJets
(Scenario #12 in series) UP 521's next work order will have you dropping a load of stone for a local crew near Bayshore then you will need to clear some sidings in the South San Fran Yard for UP 546 arriving soon. Loco: EMD GP38-2 UP - Difficulty: Easy - L...
UP 546 to South San Fran. - Part 3
Created by RBJets
(Scenario #13 in series) UP 546's trip north will end by pulling into the South San Fran Yard and dropping their Container manifest then form up the return consist for the trip south. Loco: EMD GP38-2 UP - Difficulty: Easy - Length: 65 Mins Click on above ...
Yard Work (UP 535) Part 3
Created by RBJets
(Scenario #14 in series) UP 535 is back at the Pier and needs to switch out some Container wagons then will finish up with some other tasks in the surrounding area. Loco: EMD GP38-2 UP - Difficulty: Easy - Length: 50 Mins Click on above "Peninsula Corridor...
Yard Work (UP 558)
Created by RBJets
(Scenario #15 in series) You left the cab of UP 500 to prep unit 558, you will now take both units south to Newhall with some fuel for CEMOF and misc. freight. Loco: EMD GP38-2 UP - Difficulty: Easy - Length: 60 Mins Click on above "Peninsula Corridor Seri...
Yard Work (UP 551)
Created by RBJets
(Scenario #16 in series) UP 558 just dropped of a small formation near you on the Newhall Sidings. Your job will be to fill some drop requests down the line to end this series. Loco: EMD GP38-2 UP - Difficulty: Easy - Length: 50 Mins Click on above "Penins...