Garry's Mod

Garry's Mod

Ikke nok vurderinger
Mecha Marx construction co. Waste Incineration Plant
   
Utmerkelse
Favoritt
Favoritter
Fjern som favoritt
Innholdstype: Duplikasjon
Duplikasjonsetiketter: Maskiner
Filstørrelse
Lagt ut
28.137 KB
10. sep. 2019 kl. 12.46
1 endringslogg ( vis )

Abonner for å laste ned
Mecha Marx construction co. Waste Incineration Plant

I 2 samlinger av Father Andrew
Mecha Marx construction co.
19 gjenstander
CUSTOM NPCS, VEHICLES, MACHINES, ETC 2: Electric Boogaloo
769 gjenstander
Beskrivelse
you need:

wiremod
Collision Resizer (ENHANCED),
Improved weight,
SProps Workshop Edition,
Sub Material Tool,
hl2 episode 2 (installed and mounted),
Advanced Particle Controller
and Blood and Gore Overhaul IV

for this to work

no need to unfreeze

it has 2 levers

the one on the engine starts and stops the machine and the other at the top is the emergency stop switch

"mecha marx construction is not liable for any death or dismemberment that may or may not occure, in the event that somone is to be dismembered or killed, any evidence that may prove so is to be located and disposed of within 24 hours or before the event of a warranted police search"
3 kommentarer
Father Andrew  [skaper] 30. apr. 2024 kl. 2.26 
On the engine unless wiremod updates did this in,
hiko 29. apr. 2024 kl. 17.54 
where are the levers?
boneman 12. sep. 2019 kl. 13.59 
w.t.f:
waste
tansfer
facility