Garry's Mod
Evaluări insuficiente
Mecha Marx construction co. Waste Incineration Plant
   
Premiază
Adaugă la preferate
Preferat
Elimină din preferate
Content Type: Dupe
Dupe Tags: Machines
Dimensiunea fișierului
Postat
28.137 KB
10 sept. 2019 la 12:46
1 jurnal de actualizare ( vizionare )

Abonează-te pentru a descărca
Mecha Marx construction co. Waste Incineration Plant

În 2 colecții create de Father Andrew
Mecha Marx construction co.
19 obiecte
CUSTOM NPCS, VEHICLES, MACHINES, ETC 2: Electric Boogaloo
769 obiecte
Descriere
you need:

wiremod
Collision Resizer (ENHANCED),
Improved weight,
SProps Workshop Edition,
Sub Material Tool,
hl2 episode 2 (installed and mounted),
Advanced Particle Controller
and Blood and Gore Overhaul IV

for this to work

no need to unfreeze

it has 2 levers

the one on the engine starts and stops the machine and the other at the top is the emergency stop switch

"mecha marx construction is not liable for any death or dismemberment that may or may not occure, in the event that somone is to be dismembered or killed, any evidence that may prove so is to be located and disposed of within 24 hours or before the event of a warranted police search"
3 comentarii
Father Andrew  [autor] 30 apr. 2024 la 2:26 
On the engine unless wiremod updates did this in,
hiko 29 apr. 2024 la 17:54 
where are the levers?
boneman 12 sept. 2019 la 13:59 
w.t.f:
waste
tansfer
facility