Train Simulator Classic 2024

Train Simulator Classic 2024

83 ratings
Coal Duty (CRR 916) Haysi Run - Part 2
   
Award
Favorite
Favorited
Unfavorite

Subscribe to download
Coal Duty (CRR 916) Haysi Run - Part 2

In 1 collection by RBJets
Clinchfield Railroad Series
16 items
Description
(Scenario #15 in series) With the empty drop complete up on the Haysi Branchline you are now ready to head back to Dante with the loaded cut.

Loco: EMD GP7 Pennsy - Difficulty: Easy - Length: 75 Mins

Click on above "Clinchfield Railroad Series" collection link for scenario list/order.
13 Comments
RBJets  [author] 3 Apr, 2024 @ 12:17pm 
Thanks Rob. :)
robmerlo 2 Apr, 2024 @ 10:54pm 
An excellent run thank you
PAPUCHI 17 May, 2021 @ 9:09pm 
traducir ingles a español
RBJets  [author] 9 May, 2021 @ 1:17pm 
I liked the run back better. thanks. :)
vivant123 9 May, 2021 @ 12:15am 
Back at Dante's... just had a bit of wheel slip while coming down at Haysi.. was using only dynamics... maybe cause of that. its very subjective. some locos one can use 100% dynamic without any wheel slip, while here i was using only 50% and i had wheel slip.. maybe also dependent on the load behind.. anyway enjoyed the scenario RB!!!.. only one more to go... :steamsad:
RBJets  [author] 17 Apr, 2021 @ 7:58am 
Welcome Warren, thanks for playing. :)
wadawes 17 Apr, 2021 @ 4:45am 
Good run home. Thanks again RB, most enjoyable as usual.
Cheers, Warren.
RBJets  [author] 15 Apr, 2021 @ 9:07am 
Thanks crlynch. :)
crlynch 14 Apr, 2021 @ 10:50pm 
Nice scenic run back, awesome colours last one tomorrow,cheers.
RBJets  [author] 12 Apr, 2021 @ 12:11pm 
Thanks Rammy, I thought the same because of the uphill on the way in part 1.