Update: 22 Feb, 2022 @ 9:27am

Version 1.0.3

Version 1.0.3 of the expanded "Peninsula Corridor" route includes further elements of the proposed 'Monterey County Rail Extension' with track work now extended south from Gilroy to Salinas. This stage of the route expansion also includes the new planned track layout in Salinas for when Caltrain begin operating from here.


Updated Items..
-Scenario Updates and additions
-Lowered the track speed at Moss Landing.
-Minor track speed and signal updates.
-Additional scenery added in Castroville.
-More scenery added south of Castroville towards Cooper - still to finish.
-Minor updates for the scenarios that were included in version 1.0.1 and 1.0.2
-Salinas city scenery - still to finish.

New Items..
-Additional track and scenery laid southwards on the UP Coast Sub to Salinas.
-Added the Salinas Amtrak station & basic city scenery along with the proposed track, yard and platform alterations to fit future Caltrain operations.



IN THE SIM EXTRAS ALSO IN PROGRESS:-

-Additional buildings, trees, etc in various areas.

Update: 29 Jan, 2022 @ 5:31am

Version 1.0.2

Version 1.2 of the expanded "Peninsula Corridor" route includes further elements of the proposed 'Monterey County Rail Extension' with track work gradually extending south from Gilroy, CA towards Salinas, CA. This stage of the route expansion extends the main line further south from Castroville towards Salinas.

The current Amtrak station/new Caltrain station at Salinas will be added in the near future.

Updated Items..
-Scenario Updates
-Castroville area scenery nearly completed
-Minor track defect near the CEMOF in San Jose fixed


New Items..
-Additional track and scenery laid southwards on the UP Coast Sub towards Salinas (now reached MP109)



IN THE SIM EXTRAS ALSO IN PROGRESS:-

-Additional buildings, trees, etc in various areas.

Update: 27 Jan, 2022 @ 6:55am

Version 1.0.1

Stage 1.0.1 of the expanded "Peninsula Corridor" route includes further elements of the proposed 'Monterey County Rail Extension' with track work gradually extending south from Gilroy, CA towards Salinas, CA. This stage of the route expansion extends the main line further south from Watsonville, through Moss Landing and towards Salinas, passing through Castroville and includes the new proposed Caltrain station at Castroville.

The current Amtrak station/new Caltrain station at Salinas will be added in one of the future stages.

Updated Items..
-Scenario Updates
-South San Francisco station and track layout was rebuilt by Caltrain in 2021 and this is now reflected in the sim.


New Items..
-Additional 5 miles of track and scenery laid southwards on the UP Coast Sub as far as South Castroville (MP110).
-Added the planned new station at Castroville - part of the "Monterey County Rail Extension" project (based from project plans online).

Removed Items..
-The old South San Francisco station scenery.


IN THE SIM EXTRAS ALSO IN PROGRESS:-

-Additional buildings, trees, etc in various areas.

Update: 19 Jan, 2022 @ 5:31am

Version 1.0.0

Initial Release: Stage 1 of the expanded "Peninsula Corridor" route includes the initial elements of the proposed 'Monterey County Rail Extension' with track work gradually extending south from Gilroy, CA towards Salinas, CA. Stage 1 of the route expansion includes remodelled tracks at Gilroy, CA to enable through running of trains and extends the main line an additional 25 miles south from Gilroy, passing through Logan and Watsonville and includes a new station at Pajaro/Watsonville.

The proposed Caltrain station at Castroville and the current Amtrak station/new Caltrain station at Salinas will be added in future stages.

Updated Items...

-Reworked all the original Gilroy route activities to work on this updated route - includes consist fixes** and adds some additional AI traffic where able to.

-More portals added to the full route.

-Track speed changes along the entire length of route from San Francisco to Gilroy.

-Control Points added / named correctly.

-Signalling updates in some areas (some old Tri-signals have been replaced in the real world with modern 3 aspect lights).

-Grade Crossing track fillers all corrected (most were not aligned with the tracks).

-Missing pedestrian crossing gates added.

-Track speed signs added in various locations.

-Tracks laid and scenery completed between Gilroy and Pajaro / Watsonville - includes Watsonville Yard.

-Gilroy Station - platform rework, new signals and through track - part of the "Monterey County Rail Extension" project.

**Most Caltrain trains now have fully functioning front and rear lighting.
**Most Caltrain consists in real life are now a locomotive plus 6 cars - now reflected in the sim also.



New Items...
-Additional Caltrain scenarios built for the route based on real world fall 2021 schedules.

-Additional freight scenarios.

-Added the new crossover (CP Brittan) and associated signals between San Carlos and Redwood City.

-Turnback siding at San Jose Diridon (south of the station).

-Added the planned Pajaro / Watsonville Caltrain station and associated rebuilt downtown scenery (based from project plans online).

-Initial elements of the Watsonville to Santa Cruz branch line, to aid scenario building.

-Added the Moss Landing power plant freight line and scenery.

-Track and scenery laid southwards on the UP Coast Sub as far as Moss Landing (MP105).



Removed Items...
-Gilroy Station building - impossible to build the through track otherwise - I have replaced this with another building and platform in the same location however.

-Atherton station platform markers - this station is no longer in use in the real world.



IN THE SIM EXTRAS ALSO IN PROGRESS:-