Cities: Skylines

Cities: Skylines

RAILWAY 2 - Warren & Deck Plate Girders (Pack 2)
22 則留言
REV0  [作者] 2023 年 1 月 25 日 下午 2:28 
Update: Changed Half-width to be identical to recently released deck/warren packs, as well as upcoming through deck pack.
Eresian 2022 年 2 月 26 日 下午 10:11 
That's great to hear, it's mainly the truss bridge. Thanks for the response!
REV0  [作者] 2022 年 2 月 23 日 下午 10:19 
NAR has one elevated truss and one trus bridge. If that's the reason why you're switching, Deck Girders in this pack also includes 1 and 2 lane elevated deck girder. As for warren and pratt trusses, there'll be more soon
Eresian 2022 年 2 月 23 日 下午 5:15 
The lack of a compact truss bridge like this in a double track form is severely hampering my ability to build the networks I want. The 14th street bridge is way too big. I'm still switching between this and NAR because that set is the only one that includes the bridges I need.
HappyDragon 2021 年 12 月 10 日 上午 11:08 
@Scarecrow0u812 I would like to know that too as there aren't any American fright trains that match and go with the other trains of R2
Scarecrow0u812 2021 年 11 月 1 日 下午 7:29 
what is the link to train that is featured?
LOSERDUDE 2021 年 10 月 6 日 下午 1:37 
I figured out the problem. Since i didnt plan on using electrified trains, I didnt sub to the catenary pack. If the catenary pack isnt subbed, then the option to remove catenaries dosent appear. In order to remove wires from segments, the catenary pack is required so that the option to remove wires appears. My fault for not getting all that is required, but great collection so far and am eager to see what other bridges come in the future:)
REV0  [作者] 2021 年 10 月 6 日 下午 12:12 
double track versions of girders are included in these packs. warren is single only, but i have Ohio 14th Street bridge made, I'll publish it soon
cosmic_cube_keeper 2021 年 10 月 6 日 上午 11:41 
Absolutely brilliant. I do have a question: is there a plan for a double-track version of these bridges?
REV0  [作者] 2021 年 10 月 6 日 上午 2:06 
I tested girders after your feedbacks and I can confirm that they're working as intended, image shown here:
https://i.imgur.com/kChDa0x.jpg

On default, bridge is dragged with wire and custom catenary it has shipped with. If I want to drag the bridge again -without wires- I go to the Network Skins menu and select 'none' as catenary style. When I re-drag the network, it doesnt have any wire or catenary.
LOSERDUDE 2021 年 10 月 5 日 下午 1:23 
I am also having the problem of being unable to remove transmission lines from the warren truss bridge. I can remove the lines on every other network, but when I go to remove them on the truss, the button is simply gone.
ExecutableFiles 2021 年 9 月 28 日 下午 4:56 
I checked the other girders to see if I can get the transmission wires disabled and encountered the same thing. No option to disable the catenaries.
When I said "I built the elevated tracks", I really meant the girders. Currently I am not using the Northeast Corridor pack. Sorry for that confusion.
REV0  [作者] 2021 年 9 月 28 日 上午 12:30 
Girders are using 'cantilever' identifiers for catenaries since they are custom bridge catenaries extending down the structure. As for elevated tracks with transmission wires - I will assume that you are trying to use Northeast corridor packs with no wires. Transmission wires cannot be removed with NS since it's not a train wire. You can use directly either MAINLINE networks for this purpose, Mainline net wires can be disabled.

Please let me know about other girders, I may have to make a separate wireless version or ask boformer to add cantilevers to be toggleable.

Cheers
ExecutableFiles 2021 年 9 月 27 日 下午 6:11 
It's only this network that I have the issue with. I have yet to test the other deck plate girders though.
ExecutableFiles 2021 年 9 月 27 日 下午 6:10 
Thank you so much for this, it goes very well with my city. However, when I go to disable catenaries in network skins 2, the button to swap caternaries is no longer there. When I build the elevated tracks, the catenaries are gone, but the transmission lines themselves are still visible? Any idea why this is happening?
RobBobBobert 2021 年 9 月 25 日 上午 10:15 
Can’t wait.
REV0  [作者] 2021 年 9 月 25 日 上午 10:11 
There will be, Ohio 14th Street
RobBobBobert 2021 年 9 月 25 日 上午 8:50 
Got it. Again, kudos on these. So realistic! I’d love to see a two-lane variant of the Warren truss.
REV0  [作者] 2021 年 9 月 25 日 上午 7:03 
Thanks for the comment,

Junctions on 2x2 is different so you can have lane switching from 2 to 1 lanes or use them as normal train viaducts with junctions on the middle. 1 lane has same nodes so they can be used with warren trusses. It was more a question of versatility hence why they're different in order to cover all grounds
RobBobBobert 2021 年 9 月 25 日 上午 6:56 
These are so good. One comment: the nodes for 1x2 all seem to have thr rusty red colored girders, and the 2x2 nodes are some kind of abutments, so junctions only look seamless for 1x2 rusty red. But this stuff is SO GOOD! Finally, realistic US rail. Thank you so much for your work on this project.
CityScapes 2021 年 9 月 24 日 下午 3:28 
Murica has trains?
Quboid 2021 年 9 月 24 日 下午 2:46 
Nice!