Install Steam
login
|
language
简体中文 (Simplified Chinese)
繁體中文 (Traditional Chinese)
日本語 (Japanese)
한국어 (Korean)
ไทย (Thai)
Български (Bulgarian)
Čeština (Czech)
Dansk (Danish)
Deutsch (German)
Español - España (Spanish - Spain)
Español - Latinoamérica (Spanish - Latin America)
Ελληνικά (Greek)
Français (French)
Italiano (Italian)
Bahasa Indonesia (Indonesian)
Magyar (Hungarian)
Nederlands (Dutch)
Norsk (Norwegian)
Polski (Polish)
Português (Portuguese - Portugal)
Português - Brasil (Portuguese - Brazil)
Română (Romanian)
Русский (Russian)
Suomi (Finnish)
Svenska (Swedish)
Türkçe (Turkish)
Tiếng Việt (Vietnamese)
Українська (Ukrainian)
Report a translation problem
Thank you again for responding to me and I hope you have a good day.
The drill depth needs the well head attached to the ground for it work iirc.
1. ROV, there is a cable missing that is meant to disconnect the ROV from the yellow crane carrier.
2. In the Drilling Operator. The Drill Depth gauge and Well Depth gauge are not working. I have not connected the Well Head to the ground yet, so I don't know if that has anything to do with it.
Q. Drill Rod, I don't know if it is passable but can you find a way to add more Rods to the ship.
Besides the things I pointed out, I really like the ship and I found it to be easy to use once you get used to it and I can't wait to see what you guys make next.