Train Simulator Classic 2024

Train Simulator Classic 2024

100 ratings
Yard Work (Altoona) Part 5
   
Award
Favorite
Favorited
Unfavorite

Subscribe to download
Yard Work (Altoona) Part 5

In 1 collection by RBJets
Horseshoe Curve Series
20 items
Description
(Scenario #19 in series) Loading is now done at the Freight Transfer Yard and after you drop that stock you will need to run some wagons over to the Car Shop Sidings in need of service.

Loco: EMD GP7 Pennsy - Difficulty: Easy - Length: 35 Mins

Click on above "Horseshoe Curve Series" collection link for scenario list/order.
18 Comments
RBJets  [author] 5 Jun, 2024 @ 7:48pm 
Just making sure you didn't miss anything. :)
robmerlo 5 Jun, 2024 @ 7:34pm 
Sorry my friend must have jumped this one yes i have done it and successfully thank you
RBJets  [author] 28 May, 2018 @ 11:54am 
Welcome and thanks Rammy one more to go. :)
Rammy 27 May, 2018 @ 11:44am 
That was a Very Good Tour round a Huge Yard. Thank You.
RBJets  [author] 21 May, 2018 @ 3:52am 
Thanks again Warren, enjoy the last part. :)
wadawes 21 May, 2018 @ 3:41am 
Many thanks RB, great as usual. Altoona is a huge yard and you are giving us a look at lots of it.
Cheers, Warren
RBJets  [author] 6 May, 2018 @ 1:48pm 
Thanks Chris. I try to go you all from point to point as easy as possible but a little challenge is good I think. :)
chris5012 6 May, 2018 @ 1:43pm 
Excellent scenario again RB. Very challenging working out the routing through the complex junctions but very satisfying when it all works out!!
RBJets  [author] 3 May, 2018 @ 4:29pm 
Posting tonight.......
Robbie 3 May, 2018 @ 3:13pm 
How is Donner pass is coming on