Cities: Skylines

Cities: Skylines

105 ratings
CRT Monorail station
   
Award
Favorite
Favorited
Unfavorite
File Size
Posted
3.191 MB
15 Mar, 2020 @ 2:37am
1 Change Note ( view )
You need DLC to use this item.

Subscribe to download
CRT Monorail station

In 1 collection by CR
重庆轨道交通 Chongqing rail transit
9 items
Description
重庆跨座式车站,这种车站用于重庆轨道交通3号线居多。
Chongqing straddle station, which is mainly used for chongqing rail transit line 3

车站长度为100m,高为25m,宽为20m。
The length of the station is 100m, the height 25m and the width 20m.

支持CSUR双向4车道(有隔离带)居中铺设 需要mod (Fine Road Anarchy)。
Support for CSUR two-way 4-lane (with separation) center paving required for mod (Fine Road Anarchy).

支持游戏自带4车道(有隔离带)居中铺设 需要mod (Fine Road Anarchy) 和(network skins 2 用于删除路灯)。
Support for the game's own 4-lane (with a strip) center laying needs to be mod (Fine Road Anarchy) and (network skins 2 for removing street lights).

感谢你们的订阅!
Thanks for subscribing!
15 Comments
pan.czmielu 16 Apr @ 12:56pm 
Hello, are you going to make another stations that could accomodate 8 car train?
undormant 3 Mar, 2022 @ 2:33am 
Can you please make a 4 platform simple monorail station?
CR  [author] 1 Jul, 2021 @ 6:18am 
可以
Chasel 24 Jun, 2021 @ 9:55am 
能做个可以放在6车道中间那个草丛的车站吗?
RyanCat 24 Apr, 2020 @ 9:50am 
666666
mjm92150 11 Apr, 2020 @ 9:25am 
J'ai bien hâte de voir vos nouvelles assets et merci à l'équipe pour vos travaux. :)))
CR  [author] 11 Apr, 2020 @ 8:52am 
Move It mod Mettez-le dans la bonne position
mr.v 10 Apr, 2020 @ 11:32pm 
The station is not perfectly align to the grid. Here is screenshot https://i.postimg.cc/X74x9XJ4/20200411132911-1.jpg

It will be always too left or too right cannot perfect match like the others.
mjm92150 8 Apr, 2020 @ 9:19am 
In supplementary of my message, here some exemples of double lignes (dual) and bypass (sorry for my broken English, it was not passby).
Here a link of them : https://steamhost.cn/steamcommunity_com/workshop/filedetails/?id=1800323925
It is just for your information. :)))
mjm92150 8 Apr, 2020 @ 9:01am 
Hello,
Ok, I will wait when is going to be done. It's going useful to get it.
If you are going to do it the double one, is it possible to do it another one with passby in the middle who the monorail is not got to stop for direct line ?
Anyway, at the present moment it's ok.
It's very nice station, I can imagine the double one. :)))