Planet Zoo

Planet Zoo

Not enough ratings
Modern brick staff center (stacked) with pathing instructions
   
Award
Favorite
Favorited
Unfavorite
File Size
Posted
11.991 KB
19 Mar, 2020 @ 12:56am
1 Change Note ( view )

Subscribe to download
Modern brick staff center (stacked) with pathing instructions

In 1 collection by Moving Target
Modern Brick collection
13 items
Description
All staff facilities except keeper hut, I didn't include one of those as I usually place them near habitat gates rather than at a central hub. Facilities are housed on two floors in a modern red brick building with black trim designed to co-ordinate with other buildings in this set, click the Modern Brick building collection link above to see them all as well as get links to my other collections, please leave a like and thank you for subscribing
The 2 large circles provided for help with positioning the upper path can just be deleted if not required

FULL INSTRUCTIONS FOR PLACING PATHS: The numbered instructions also refer to the screenshots above in which only the basic buildings are shown for clarification as in the real build your path will be hidden under the built in flooring.

Path settings - Angle snap set to 90 deg - path length set to 1 - width set to 4 mtr - railing on elevated turned off

STEP 1 - Position a 4 mtr path piece on the YELLOW circle, hold shift and raise the path until it sits just on top of the WHITE circle above, SLOWLY move the path piece towards the building until the path snaps to the quarantine door. NOTE: If you move too quickly or too close to the building the path will snap to the lower floor in which case just start again.
STEP 2 - Attach a path piece to the door of the Quarantine building
STEP 3 - Use that path piece to ALIGN TO GRID and run a path under all the flooring pieces including the curved part at the right side
STEP 4 - Turn off the grid and make sure ANGLE SNAP is set to 90 deg and PATH LENGTH is set to 1, click ONCE to place one path piece along the side of the Trade Centre
STEP 5 - Drag down on your mouse to form stairs and place 2 stair pieces and a single flat path piece at the bottom
STEP 6 - Use that single path piece to ALIGN TO GRID and run a path back past the stairs and along the front of the building under the flooring pieces, when you have laid all the path you want turn off the grid and check each facility to make sure it is connected.

EXTRA RECOMMENDATIONS: These are just my personal preferences but for better co-ordination with the building I used the LODGE WOOD path type under the built in flooring pieces on the upper floor as it has a dark kerb that blends well and I used the ASPHALT DARK for the stairs because the black appearance fits with the theme
2 Comments
Moving Target  [author] 24 Mar, 2020 @ 3:39pm 
WOW! Thank you very much and enjoy
Jendowoz 24 Mar, 2020 @ 2:47pm 
You did a brilliant job of this and I've subscribed to all of them, Nicely done!