Rail Route

Rail Route

109 ratings
Zhenlong Area 镇龙区域
   
Award
Favorite
Favorited
Unfavorite
Maps: Timetable, Easy
File Size
Posted
Updated
992.874 KB
25 Jun, 2021 @ 3:41am
2 Dec, 2021 @ 5:32pm
4 Change Notes ( view )

Subscribe to download
Zhenlong Area 镇龙区域

Description
中文简介在下面。

This is the map of Zhenlong area in Guangzhou Metro.
The map consists of 7 stations.
(Jinkeng, Zhenlongxi, Zhenlong, Zhongxin, Kengbei, Zhenlongbei and Zhenlong Depot)
There are 5 stations on Line 21 (from Jinkeng to Kengbei),
2 stations on Line 14 (Zhenlongbei and Zhenlong),
and 1 depot (Function is the same as stations).

There are 6 kinds of services in this map.

140n - Line 14 train
(From Zhenlongbei to Zhenlong, then reverse, and go back to Zhenlongbei)

14D1 - Line 14 train that goes to the depot
(From Zhenlongbei to Zhenlong Depot)

14E1 - Line 14 train that comes from the depot
(From Zhenlong Depot to Zhenlongbei)

210n and 211n - Line 21 local train
(Stop at every stations between Jinkeng and Kengbei)

21X1 and 21X2 - Line 21 express train
(Only stop at Zhenlong)

21D1 and 21D2 - Line 21 local trains that go to the depot
(Required to stop at Zhenlongxi [3] and then go to the depot)

For Line 21, if a local train stops at signal, marks will not be deducted.
However, if a express train stops at a signal, marks WILL BE deducted.

For Zhenlong station on Line 14,
Please do not reverse on the platform!
Reverse using the track in the east part of the station!

THE TIMETABLE IS NOT BASED ON THE TIMETABLE IN THE REAL WORLD.

Duration: ~40min
Full mark: 640
Number of trains: 16

——————

这是广州地铁镇龙区域的地图。
这个地图包含7站。
(金坑、镇龙西、镇龙、中新、坑贝、镇龙北和镇龙车辆段)
其中5站属于21号线(从金坑到坑贝),
2站属于14号线(镇龙北和镇龙),
还有一个车辆段(功能跟车站一样)

这个地图有6种列车。

140n - 14号线列车
(从镇龙北到镇龙,然后折返,回镇龙北)

14D1 - 14号线回库车
(从镇龙北到镇龙车辆段)

14E1 - 14号线出库车
(从镇龙车辆段到镇龙北)

210n 和 211n - 21号线普通车
(金坑至坑贝各站停靠)

21X1 和 21X2 - 21号线快车
(只停镇龙)

21D1 和 21D2 - 21号线回库车
(要求停靠镇龙西3站台然后去镇龙车辆段)

21号线普通车机外不会扣分。
不过21号线快车机外会被扣分。

14号线镇龙站,
请不要在站台上折返!
请用东侧折返线折返!

时刻表不是基于现实时刻表制作。

时长:约40分钟
满分:640
列车数量:16