Rail Route

Rail Route

51 ratings
长春枢纽全天客运调度 Changchun Hub All-day Passenger Dispatch
   
Award
Favorite
Favorited
Unfavorite
Maps: Timetable, Easy
File Size
Posted
Updated
3.944 MB
25 Oct, 2021 @ 7:31am
26 Oct, 2021 @ 2:21am
3 Change Notes ( view )

Subscribe to download
长春枢纽全天客运调度 Changchun Hub All-day Passenger Dispatch

Description
图中包括了京哈铁路、京哈高铁、长(吉)珲城际、长图线。
The figure includes Peking-Haerbin Railway, Peking-Haerbin High-speed Railway, Chang(ji)hui intercity.

此图共367趟列车,时间为00:12-次日00:10。
There are 367 trains in this picture, the time is 00:12-Next day 00:10.
长春站,长春西站现已开放。
Changchun Station, Changchun West Railway Station is now open.

长春站,位于中国吉林省长春市宽城区,是中国铁路沈阳局集团有限公司管辖的特等站,是吉林省重要的交通枢纽。1907年11月3日,长春站开始货运。同年12月1日,长春站开始客运。1993年12月28日,长春站第二代站房建成使用。2013年11月25日,长春站实现了南北站房的全面贯通。截至2020年7月,长春站设有9台16线,南站房总建筑面积50162平方米,北站房总建筑面积为50532平方米。2020年,长春站承载量为年发送旅客1750万人次。
Changchun Railway Station, located in Kuancheng District, Changchun City, Jilin Province, China, is a special-class station under the jurisdiction of China Railway Shenyang Bureau Group Co., Ltd. and an important transportation hub in Jilin Province. On November 3, 1907, Changchun Station started freight. On December 1st of the same year, Changchun Station started passenger transportation. On December 28, 1993, the second-generation station building of Changchun Station was completed and put into use. On November 25, 2013, Changchun Station realized the full connection of the north-south station buildings. As of July 2020, Changchun Station has 9 stations and 16 lines. The total construction area of the South Station is 50,162 square meters, and the total construction area of the North Station is 50,532 square meters. In 2020, the carrying capacity of Changchun Station will send 17.5 million passengers annually.

长春西站,位于中国吉林省长春市绿园区,是中国铁路沈阳局集团有限公司管辖的客运站,也是京哈高速铁路的中间站。2009年10月28日,长春西站站房开工建设。2012年12月1日,长春西站正式投入运营。截至2018年10月,长春西站设有5台11线,站房总面积61456平方米,设计承载量为日均发送4.8万人次。
Changchun West Railway Station, located in Lvyuan District, Changchun City, Jilin Province, China, is a passenger station under the jurisdiction of China Railway Shenyang Bureau Group Co., Ltd. and an intermediate station of Peking-Harbin High-speed Railway. On October 28, 2009, Changchun West Railway Station started construction. On December 1, 2012, Changchun West Railway Station was officially put into operation. As of October 2018, Changchun West Railway Station has 5 stations and 11 lines, with a total station area of 61,456 square meters, and a designed carrying capacity of 48,000 passengers per day.

如发现时刻表等问题请在评论区留言,谢谢。
If you find any problems, please leave a message in the comment area,thank you.



感谢steam用户:摩卡好可爱提供地图支持。
Thanks to steam users: Mocha is so cute for providing map support.
3 Comments
BG2KSS 27 Feb, 2024 @ 5:38am 
坐等大佬更新
1205830768 15 Oct, 2023 @ 2:54am 
可以考虑更新一下吗大佬:steamhappy:
FLRAIN 14 Mar, 2022 @ 4:22am 
G8002无法准点抵达长春站(表定5:41,实际5:42)