Rolling Line

Rolling Line

Not enough ratings
Sunny Sidings 2
   
Award
Favorite
Favorited
Unfavorite
Layout
Regions: Global
File Size
Posted
Updated
519.528 KB
24 Jan @ 7:28am
24 Jan @ 8:14am
2 Change Notes ( view )

Subscribe to download
Sunny Sidings 2

Description
The Yard manager was impressed by how quickly you dispatched those nine wagons at the start of the shift. Now, near the end of the shift nine more wagons are returning for storage. During a break in the weather, the Yard Manager went out to set the switches for the incoming train, so that it has a smooth run in and out of the yard.

For some reason, he's asked you to wait with the shunter ready to put the wagons on the correct storage tracks.

The preferred storage is as follows:

1
2
3
4
REST
MAIN
HUT
6
3
0
0
0
0



When you've completed the task guide the shunter back to the REST Track and come back inside for another hot coffee.

Again, do no take over the controls of the main train or the shunter. Also, be patient waiting for the shunter driver to start up. He is very experienced and times his start up perfectly. (Usually).

Good luck!
1 Comments
elENblef 24 Jan @ 11:41am 
Hi Merlin