Poly Bridge

Poly Bridge

Not enough ratings
Extreme Drop Bridge
   
Award
Favorite
Favorited
Unfavorite
File Size
Posted
9.355 KB
26 Oct, 2015 @ 3:27am
1 Change Note ( view )

Subscribe to download
Extreme Drop Bridge

Description
Build a 10m double-decker bridge, with only enough materials for one deck, bridge must be resetable as there are 2 hydraulic phases. Budget: $18,000, 1 Hydraulics, 1 Steel, 5 Road, Unlimited Wood and Cable. Difficulty: 5/5

This is the extreme version of my Drop Bridge. The added difficulty is primarily in the requirement that the bridge can be reset.
2 Comments
Blake Walsh  [author] 8 Nov, 2015 @ 2:55am 
Some nice solutions there bolt, the solution I used for submission was: http://i.imgur.com/9RnBydt.gifv
bolt986 7 Nov, 2015 @ 1:30am 
Four solutions: second is far over budget. http://imgur.com/a/3b6Et