Train Simulator Classic 2024

Train Simulator Classic 2024

55 ratings
Marias Pass Series
2
   
Award
Favorite
Favorited
Unfavorite
Description
Early morning in Montana and you will be collecting some loaded stock then re-stocking sidings with empties around the Kalispell area and then it will be time for departure later in the day. This series is the first I tried having some scenarios happening around the same time of each other. An AI train you pass in one scenario you'll be driving it in the next. After you arrive in Whitefish you will sort out stock that a consist will take to Shelby and along the way you'll come along shunting scenarios and then a return trip to Whitefish and back to Kalispell where it all began.

Scenario order:
1) Yard Work (Kalispell) Part 1
2) Yard Work (Kalispell) Part 2
3) Leaving Plum Creek - Part 1
4) Leaving Plum Creek - Part 2
5) Yard Work (Columbia Falls)
6) Yard Work (Whitefish) - Part 1
7) Leaving Whitefish - Part 1
8) Yard Work (Conkelly)
9) Leaving Whitefish - Part 2
10) Yard Work (Whitefish) - Part 2
11) Leaving Whitefish - Part 3
12) Leaving Whitefish - Part 4
13) Yard Work (Essex)
14) Leaving Whitefish - Part 5
15) Leaving Whitefish - Part 6
16) Leaving Whitefish - Part 7
17) Leaving Whitefish - Part 8
18) Leaving Whitefish - Part 9
19) Yard Work (Cut Bank)
20) Leaving Whitefish - Part 10
21) Yard Work (Shelby)
22) Return to Whitefish - Part 1
23) Return to Whitefish - Part 2
24) Return to Whitefish - Part 3
25) Return to Whitefish - Part 4
26) Yard Work (Summit - Glacier Park)
27) Yard Work (Blacktail - Essex)
28) Return to Whitefish - Part 5
29) Return to Whitefish - Part 6
30) Return to Whitefish - Part 7
31) Return to Whitefish - Part 8
32) Yard Work (Conkelly - Columbia Falls)
33) Yard Work (Whitefish) Part 3
34) Run to Kalispell
35) Yard Work (Whitefish - Columbia Falls)
36) Yard Work (Kalispell) Part 3
Items (36)
Yard Work (Kalispell) Part 1
Created by RBJets
(Scenario #1 in series) Early morning in Montana and you will be collecting some loaded stock from around the area and bring it back to the yard for departure later in the day. Loco: EMD SW1500 Swithcher Burlington - Difficulty: Easy - Length: 40 Mins. Cli...
Yard Work (Kalispell) Part 2
Created by RBJets
(Scenario #2 in series) After collecting full stock from around area in "Yard Work (Kalispell) Part 1", it is now time to put empty cars back at the same locations in Kalispell. Loco: EMD SW1500 Swithcher Burlington - Difficulty: Easy - Length: 40 Mins. Cl...
Leaving Plum Creek - Part 1
Created by RBJets
(Scenario #3 in series) If you played "Yard Work (Kalispell) Parts 1 & 2" you gathered then dropped off this small consist at Plum Creek. It is now time to take it up to Columbia Falls. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 35 Mins. Click on abov...
Leaving Plum Creek - Part 2
Created by RBJets
(Scenario #4 in series) In part 2 of this scenario we finish our run by pulling into Whitefish. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 35 Mins. Click on above "Marias Pass Series" collection link for scenario list/order. ...
Yard Work (Columbia Falls)
Created by RBJets
(Scenario #5 in series) In Columbia Falls you will be dropping off a few empties and gathering a small consist for a freight coming from Whitefish. As this series continues some of the scenarios will all "kinda" be happening around the same time of each ot...
Yard Work (Whitefish) Part 1
Created by RBJets
(Scenario #6 in series) As this Marias Pass series continues in Whitefish you will be assembling a freight that needs to head out ASAP. Then you will gather up some empties to end Part 1. Loco: EMD SW1500 Switcher Burlington - Difficulty: Med. - Length: 25...
Leaving Whitefish - Part 1
Created by RBJets
(Scenario #7 in series) Next you will be pulling a freight out of Whitefish and heading east. You will also be picking up some stock in Columbia Falls before you end Part 1. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 30 Mins Click on above "Marias Pas...
Yard Work (Conkelly)
Created by RBJets
(Scenario #8 in series) Next up in the Marias Pass series is the Conkelly plant. You'll be forming a consist that needs taken up to the Columbia Falls sidings, dropping off some supplies and empties. Loco: EMD SW1500 Swithcher Burlington - Difficulty: Med....
Leaving Whitefish - Part 2
Created by RBJets
(Scenario #9 in series) The series continues at Conram with a quick drop off then you'll end Part 2 in Belton by supplying a crew with some empty Centerbeam wagons. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 25 Mins Click on above "Marias Pass Series"...
Yard Work (Whitefish) Part 2
Created by RBJets
(Scenario #10 in series) Next up in Whitefish you will be switching out some empties then grabbing some full stock at the Half Moon Lumber Yard. Loco: EMD SW1500 Switcher Burlington - Difficulty: Easy - Length: 35 Mins Click on above "Marias Pass Series" c...
Leaving Whitefish - Part 3
Created by RBJets
(Scenario #11 in series) The series continues at Belton with a quick pickup in Red Eagle then it is off to Paola to end Part 3. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 35 Mins Click on above "Marias Pass Series" collection link for scenario list/or...
Leaving Whitefish - Part 4
Created by RBJets
(Scenario #12 in series) This will be a short run into Essex to drop off and pick up some stock in the next scenario: "Yard Work (Essex)". Loco: BNSF ES44 DC - Difficulty: Easy - Length: 20 Mins Click on above "Marias Pass Series" collection link for scena...
Yard Work (Essex)
Created by RBJets
(Scenario #13 in series) This scenario takes place right after "Leaving Whitefish - Part 4". You'll need to switch out some freight for that consist so they can continue their trip East. Loco: EMD SW1500 switcher - Difficulty: Med. - Length: 30 Mins Click ...
Leaving Whitefish - Part 5
Created by RBJets
(Scenario #14 in series) In "Yard Work (Essex)" some stock was switched out and now you are ready to continue East to Blacktail. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 30 Mins Click on above "Marias Pass Series" collection link for scenario list/o...
Leaving Whitefish - Part 6
Created by RBJets
(Scenario #15 in series) After a short stop in Blacktail some stock is waiting to be picked up in Summit, Montana (Elevation 5215 - Continental Divide). Loco: BNSF ES44 DC - Difficulty: Easy - Length: 35 Mins Click on above "Marias Pass Series" collection ...
Leaving Whitefish - Part 7
Created by RBJets
(Scenario #16 in series) In part 7 you will be dropping off and picking up in Glacier Park then it is off to Spotted Robe to end this part and wait for some freight to be loaded for part 8. Loco: BNSF ES44 DC - Difficulty: Med. - Length: 35 Mins Click on a...
Leaving Whitefish - Part 8
Created by RBJets
(Scenario #17 in series) This part will cover Spotted Robe to Blackfoot and along the way you will be doing a few drops before we call it a day. Part 9 will continue with it being the next morning. Loco: BNSF ES44 DC - Difficulty: Med. - Length: 35 Mins Cl...
Leaving Whitefish - Part 9
Created by RBJets
(Scenario #18 in series) Part 9 goes from Blackfoot to a stop at the yard in Cut Bank. You'll drop some Centerbeam stock and a switcher crew in the scenario: "Yard Work (Cut Bank)" will gather up some cars for you to take in "Leaving Whitefish - Part 10". ...
Yard Work (Cut Bank)
Created by RBJets
(Scenario #19 in series) The consist from the "Leaving Whitefish" scenarios has just pulled into Cut Bank and need some various stock gathered for their final leg of into Shelby. Loco: EMD SW1500 Switcher - Difficulty: Med. - Length: 30 Mins Click on above...
Leaving Whitefish - Part 10
Created by RBJets
(Scenario #20 in series) With the switcher crew from "Yard Work (Cut Bank)" done gathering what you need it is now time to head to Shelby to finish your journey across Marias Pass before heading back to Whitefish with another consist. Loco: BNSF ES44 DC - ...
Yard Work (Shelby)
Created by RBJets
(Scenario #21 in series) Now in Shelby, you will be forming up the consist that you will be taking out later as you head back to Whitefish. Loco: EMD SW1500 Switcher Burlington - Difficulty: Med. - Length: 60 Mins Click on above "Marias Pass Series" collec...
Return to Whitefish - Part 1
Created by RBJets
(Scenario #22 in series) The time has come to head back to Whitefish. You formed up your return consist in "Yard Work (Shelby)" and will now head back across Marias Pass. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 45 Mins Click on above "Marias Pass S...
Return to Whitefish - Part 2
Created by RBJets
(Scenario #23 in series) Some wagons that you dropped in Blackfoot during the "Leaving Whitefish" trip are now empty and need cleared. Part 2 will end there as a local crew will add this stock to your consist. Loco: BNSF ES44 DC - Difficulty: Easy - Length...
Return to Whitefish - Part 3
Created by RBJets
(Scenario #24 in series) The crew in Blackfoot added the empty Cement Hopper wagons to your consist and your next stop while eastbound traffic passes will be in Grizzly. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 30 Mins Click on above "Marias Pass Se...
Return to Whitefish - Part 4
Created by RBJets
(Scenario #25 in series) Eastbound traffic has just passed you in Grizzly. After you go over the Continental Divide in Summit you will stop east of Blacktail. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 40 Mins Click on above "Marias Pass Series" colle...
Yard Work (Summit - Glacier Park)
Created by RBJets
(Scenario #26 in series) The "Return to Whitefish" freight just went through and now the line is clear for you to make your run up to Glacier Park to drop off some stock and reclaim some empty wagons. Loco: EMD SW1500 Swithcher Burlington - Difficulty: Eas...
Yard Work (Blacktail - Essex)
Created by RBJets
(Scenario #27 in series) You just recieved a call from dispatch that the "Return to Whitefish" freight needs a siding to drop off some cars in need of repair. You'll clear a siding in Blacktail then head back to the yard in Essex. Loco: EMD SW1500 Swithche...
Return to Whitefish - Part 5
Created by RBJets
(Scenario #28 in series) The siding in Blacktail is now clear thanks to the "Yard Work (Blacktail - Essex)" crew. You can now drop the cars in need of service then continue to your stop in Essex. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 40 Mins Clic...
Return to Whitefish - Part 6
Created by RBJets
(Scenario #29 in series) Time to leave Essex for a quick pick up in Red Eagle before you end this next part that will bring you closer to Whitefish. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 35 Mins Click on above "Marias Pass Series" collection link...
Return to Whitefish - Part 7
Created by RBJets
(Scenario #30 in series) Just outside of your pick-up in Red Eagle you will have another in Belton then stop for an eastbound freight in Coram. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 35 Mins Click on above "Marias Pass Series" collection link for ...
Return to Whitefish - Part 8
Created by RBJets
(Scenario #31 in series) As soon as you are clear to proceed you'll have one last drop then it's finally time to arrive back in Whitefish. Loco: BNSF ES44 DC - Difficulty: Easy - Length: 45 Mins Click on above "Marias Pass Series" collection link for scena...
Yard Work (Conkelly - Columbia Falls)
Created by RBJets
(Scenario #32 in series) The "Return to Whitefish" consist just came through and dropped some stock off in Conkelly which needs to be added to a cut of wagons up on the Columbia Falls sidings. Along with that you'll also have some other tasks to tend to in...
Yard Work (Whitefish) Part 3
Created by RBJets
(Scenario #33 in series) The "Return to Whitefish" consist just arrived and you need to sort out that consist plus run some wagons down to the east end of the yard for a morning run down to Kalispell. Loco: EMD SW1500 Swithcher Burlington - Difficulty: Eas...
Run to Kalispell
Created by RBJets
(Scenario #34 in series) Now the next morning in Whitefish you need to run a small consist to Kalispell then the "Yard Work (Kalispell) Part 3" crew will sort out those wagons then bring back stock for a trip to Olney. Loco: BNSF ES44 DC - Difficulty: Easy...
Yard Work (Whitefish - Columbia Falls)
Created by RBJets
(Scenario #35 in series) With the "Run to Kalispell" consist heading to Kalispell you will need to grab some stock at the Half Moon Plant for that freight and place it down at Columbia Falls for their trip to Onley later in the day. Loco: EMD SW1500 Swithc...
Yard Work (Kalispell) Part 3
Created by RBJets
(Scenario #36 in series) The "Run to Kalispell" consist has just arrived with some empties that need sorted in the area. After that you will gather up stock for BNSF 7202 that needs taken to Onley. Thanks to everyone for playing this short series. (giggle)...