Barotrauma

Barotrauma

CNV-39 Sakira
Showing 1-9 of 9 entries
Update: 2 Sep, 2024 @ 4:23pm

Fixed top docking hatch logic (Wasn't opening when docked)

Update: 28 Aug, 2024 @ 3:04pm

Added duct to storage room, fixed water routing issues in cargo bay, fixed bot pathing (hopefully) on lounge upper hatch.

Update: 28 Aug, 2024 @ 2:33pm

Set "Display Linked" on medical cabinet to show in the medical fabricator UI

Update: 26 Aug, 2024 @ 3:28pm

Added power lines to the main diving cabinets.

Update: 25 Aug, 2024 @ 8:24pm

Recalculated bot navigation
Wired duct in moonpool to open when upper section is flooded.

Update: 25 Aug, 2024 @ 12:52am

Fixed engine deterioration (Hitbox in water)
Added power lines to status monitors
Fixed blinking pulse laser loader

Update: 24 Aug, 2024 @ 9:51pm

Added nuclear power output requirement to the pulse laser.

Update: 24 Aug, 2024 @ 9:47pm

Wired the electrical discharge coils with IFF detection.

Update: 24 Aug, 2024 @ 5:11pm

TODO: Discharge Coils need wiring