Install Steam
login
|
language
简体中文 (Simplified Chinese)
繁體中文 (Traditional Chinese)
日本語 (Japanese)
한국어 (Korean)
ไทย (Thai)
Български (Bulgarian)
Čeština (Czech)
Dansk (Danish)
Deutsch (German)
Español - España (Spanish - Spain)
Español - Latinoamérica (Spanish - Latin America)
Ελληνικά (Greek)
Français (French)
Italiano (Italian)
Bahasa Indonesia (Indonesian)
Magyar (Hungarian)
Nederlands (Dutch)
Norsk (Norwegian)
Polski (Polish)
Português (Portuguese - Portugal)
Português - Brasil (Portuguese - Brazil)
Română (Romanian)
Русский (Russian)
Suomi (Finnish)
Svenska (Swedish)
Türkçe (Turkish)
Tiếng Việt (Vietnamese)
Українська (Ukrainian)
Report a translation problem
And thanks for the heads up about the Loader! I'll add the pack to requirements :)
As an aside, I switched to the WP/Sunset harbor version of the MRF buildings collection, and the Glass MRF requires a prop called "Loader" that is not listed in either that collection or that version of the individual building. LSM suggested that it might be part of the Construction Equipment props pack .
First of, i ik your mods.
But this Facility collects from Buildings and dont deliver to the Process Facilitys. in fact for me the processors get their trash from the normal city buildings, and completly ignbore landfills or recycling centers. even with the transfer manager mod i cant get it running.
https://steamhost.cn/steamcommunity_com/sharedfiles/filedetails/?id=1806759255&searchtext=customize+it
Sorry to bother you, but I recently got Cities and have been really enjoying your recycling options as I am going for a green city without pollution. I am curious if maybe I am doing something wrong as these recycling drop offs only have a capacity of 1m which is eight times less than the landfill you get with vanilla. I find I'm having to micromanage the drop off constantly as they keep filling up super quickly, and then my Cims complain that their garbage isn't being picked up (my recycling facilities can't handle my garbage demand without the drop offs). The drop offs fill within a few minutes on full speed (empty even quicker), and if im managing traffic or building they just fil up without me paying attention, and if i don't watch them to set them back to fill mode they just sit there, and everything backs up. Is there any way I can make it so that they can hold the same amount as the normal landfills? (I don't have Sunset Harbour)
Waste Transfer Facility
Waste Processing Complex
do you have plans to update / redesign the drop off center to function as a true transfer station? (I realize this could potentially require a complete rebuild, and be more than you want to put forth. but thought it worth asking just in case, because I really enjoy your work and how these look/tie into each other.
Bike Middle
Required in: 674169064.Recycling drop-off center_Data
Workshop asset requires DLC or mod content?
While this works without After Dark and the "Bike Middle" asset supplied by it, the message about the missing asset (given by e.g Loading Screen Mod) is causing unnecessary concern, if one doesn't know why they are seeing it.