Voxel Tycoon

Voxel Tycoon

Transport capacity estimator & logistics calculator 2.0
2739294360 14 Aug, 2021 @ 6:21am
zh_cn | Translation
I have some trouble in publish an translation item in Voxel Tycoon's Workshop, this is my translation:
{
"schedule_stopwatch/missing_time_segment": "缺少部分路线的数据",
"schedule_stopwatch/times_per_month": "路线周期 ({0}x 每月)",
"schedule_stopwatch/days_hours": "{0}天 {1}小时",
"schedule_stopwatch/hours_minutes": "{0}小时 {1}分钟",
"schedule_stopwatch/unknown": "未知",
"schedule_stopwatch/display_time_for_inidividual_tasks": "显示日程中各个任务的时间",
"schedule_stopwatch/display_totaltime_in_schedule": "在载具窗口中显示总时间",
"schedule_stopwatch/display_total_capacity": "在载具窗口中显示每月总运力",
"schedule_stopwatch/display_individual_unloading_capacity": "显示每个任务的预期每月运入项目数量",
"schedule_stopwatch/display_individual_loading_capacity": "显示每个任务的预期每月运出物品数量",
"schedule_stopwatch/display_station_loading_capacity": "在载具窗口中显示预期运入物品的数量",
"schedule_stopwatch/display_station_unloading_capacity": "在载具窗口中显示预期运出物品的数量",
"schedule_stopwatch/settings_window_title": "运输能力估算器设置",
"schedule_stopwatch/loaded_items_count": "运走了 {0} 个",
"schedule_stopwatch/unloaded_items_count": "运来了 {0} 个",
"schedule_stopwatch/estim_monthly_transf": "预计每月运送量",
"schedule_stopwatch/estim_monthly_transf_hint": "(本车/所有同一路线车辆)",
"schedule_stopwatch/total_transfer": "总运力",
"schedule_stopwatch/task_times_hint": "距离上一任务的行程时间/车站滞留时间\n灰色表示时间估计",
"schedule_stopwatch/monthly_unloaded_items": "每月预计运入量",
"schedule_stopwatch/monthly_loaded_items": "每月预计运出量",
"schedule_stopwatch/needed_items_to_produce": "渴求更多的商品",
"schedule_stopwatch/needed_items_to_produce_this": "需要更多的原材料来制造它",
"schedule_stopwatch/number_of_mines": "{0} of {1}",
"schedule_stopwatch/no_transfers": "没有运输",
"schedule_stopwatch/no_transfers_data": "缺少运输数据",
"schedule_stopwatch/average_schedule_speed": "平均速度: {0} {1}",
"schedule_stopwatch/ratio_loading_total": "装运时间占总时间的比重: {0}%",
"schedule_stopwatch/partial": "部分的",
"schedule_stopwatch/monthly_demand": "(月度需求)",
"schedule_stopwatch/estimated": "(估计)",
"schedule_stopwatch/inaccurate": "(不准确)",
"schedule_stopwatch/add_new_demand_tooltip": "新增了一座需求建筑(实验室或是商店)",
"schedule_stopwatch/connect_station_tooltip": "连接一个额外的站点,用于每月需求、交付和取货的总和。",
"schedule_stopwatch/demanded_items_tooltip": "货运站范围内的商店和实验室直接需要的物品。",
"schedule_stopwatch/needed_items_tooltip": "生产所需的物品,并在站内挑选物品。",
"schedule_stopwatch/needed_factories_tooltip": "需要在站点内生产请求和拣配的物品的工厂数量。",
"schedule_stopwatch/buildings_with_demand": "建筑物需求",
"schedule_stopwatch/connected_stations": "已连接的站点",
"schedule_stopwatch/demanded_items": "需求的物品",
"schedule_stopwatch/needed_items": "每月需求量",
"schedule_stopwatch/factories_needed": "满足需求的最小工厂数量",
"schedule_stopwatch/logistics_2": "Logistics II",
"schedule_stopwatch/add_building_for_demand": "新加入站点的需求建筑",
"schedule_stopwatch/already_added": "已经被添加",
"schedule_stopwatch/pick_store_or_lab": "满足商店或实验室的需求",
"schedule_stopwatch/add_connected_station": "增加与之互联的车站",
"schedule_stopwatch/pick_station": "货运站",
"schedule_stopwatch/remove": "移除",
"schedule_stopwatch/no_demanded_items": "没有需求物品",
"schedule_stopwatch/calculate_unserviced_demands": "计算没有送货订单的商店所需的物品",
"schedule_stopwatch/calculate_unserviced_demands_description": "即使尚未向商店提供服务,也计算商店需求的物品和对应工厂的生产能力。"
}
< >
Showing 1-1 of 1 comments
xmnovotny  [developer] 15 Aug, 2021 @ 10:40pm 
Thanks for the translation. It is added to the mod now.
< >
Showing 1-1 of 1 comments
Per page: 1530 50