Parkitect

Parkitect

Not enough ratings
Monorail Mania
   
Award
Favorite
Favorited
Unfavorite
Scenarios: Scenario
Tags: No Mods
File Size
Posted
758.637 KB
10 Jan, 2022 @ 9:32pm
1 Change Note ( view )
You need DLC to use this item.

Subscribe to download
Monorail Mania

In 1 collection by AstroTron
AstroTron's Scenarios Season 2
18 items
Description
Welcome to Metro Center. You have been given the task to build a theme park using the monorail system to ferry guests between plots. One section of the monorail is unfinished. Good luck HappyCo. is watching.

Scenario:
• Have at least 4 coasters in your park with an excitement rating of 55.0 or above
• Have an experiences rating of at least 80%
• Have at least 500 guests in your park
• Have at least 1,000 guests in your park
• Have no loan debts
• Have an operating profit of at least $5,000.00
• Optional: Complete all goals without using any tracked ride blueprints
5 Comments
glorious.tachikoma 14 Jan, 2022 @ 10:04pm 
I did have success. I had to take out a bigger loan and operate on a deficit for a few months, but traffic picked up enough to make a profitable park. I'm probably going to get to the same point as with Zypherus Plains in that I'll get a developed park, struggle to get anywhere close to the monthly profit goal, and then play another scenario. But this one really is a treat to look at. At this point my only real critique is that the layout of the plots means that one doesn't have an incentive to pan the camera over the rest of the lovely cityscape.
AstroTron  [author] 12 Jan, 2022 @ 8:52pm 
Thanks for the feedback.
glorious.tachikoma 12 Jan, 2022 @ 8:34pm 
Started to. Running into a huge cashflow issue so far. I am trying ti play more like Silvarret and really make rides look good as I build them, but finishing the monorail, a decent coaster, and a couple of flat rides exhausts the starting cash. Right off the bat that monorail is a good few hundred a month in running costs and its required to keep guests from getting stuck in the two empty plots. Some of the guests also disembark the monorail station in the city and just despawn which interrupts that guest spending money. I'm not saying its bad, its just the most challenging scenario of yours I've attempted so far. (I don't touch pay-per-entry scenarios as one can NOT generate enough cash flow for a more casual play style) I can't even get close to Zypherus Plains' 4K/mo profit with four damn good coasters and lots of flat rides, getting to 5k in this will be an outright adventure.
AstroTron  [author] 12 Jan, 2022 @ 6:24am 
Did you play it yet?
glorious.tachikoma 11 Jan, 2022 @ 10:01pm 
This has me kind of excited to play because for the first half of "Power Play" I was using a monorail as the only link between the two halves of the park. It taught me that unlike RCT, you need to have very large stations and trains compared to the coasters. It also taught me that Point to Point, even between only two stations, is TERRIBLE. Continuous circuit and multiple trains is the only practical way to make something like this work imho.