Update: 7 Dec, 2024 @ 7:05am

Forrestal runway elevator fix

Update: 7 Dec, 2024 @ 6:27am

Landing intensity upgrade implemented into Forrestal

Update: 6 Dec, 2024 @ 12:36pm

Implementation of landing operations upgrade into Nimitz class. Minor changes in holding and landing patterns.

Update: 5 Dec, 2024 @ 3:12am

Landing operations efficency upgrade (Kitty Hawk, America)

Update: 2 Dec, 2024 @ 12:00pm

New size of picture

Update: 1 Dec, 2024 @ 8:00am

Update workshop item

Update: 1 Dec, 2024 @ 7:03am

On Nimitz, Kitty Hawk and America both runway catapults are served only by 1 left elevator. In real life, generaly, these catapults can't operate exactly in the same way as bow catapults. Due to proximity of these catapults, there must be a bit more time between launches. That's why one elevator to serve them is enough. Another freed elevator is dedicated only to helis and in consequence operations with planes and helis are able at any time independently on number of launching planes and helis.
On Forrestal runway catapults are served by 2 elevators, so planes and helis operations in some circumstances may collide. Runway elevator is unoperable during launching planes. Implementation the same scheme of operationes as in other US aircraft carriers is possible but leaves only 2 elevators to serve 4 catapults. Effectivnes of such launching operations is too low.

Update: 30 Nov, 2024 @ 12:49pm

Update workshop item

Update: 30 Nov, 2024 @ 12:31pm

Changed elevators' reaction times. When all elevators are in up position and more than 1 plane/heli is ordered to take-off, lifts start to move down in slighty different moment, so it looks more natural.

Update: 29 Nov, 2024 @ 1:37pm

Few minor taxi ways corrections