Instalar Steam
iniciar sesión
|
idioma
简体中文 (chino simplificado)
繁體中文 (chino tradicional)
日本語 (japonés)
한국어 (coreano)
ไทย (tailandés)
Български (búlgaro)
Čeština (checo)
Dansk (danés)
Deutsch (alemán)
English (inglés)
Español de Hispanoamérica
Ελληνικά (griego)
Français (francés)
Italiano
Bahasa Indonesia (indonesio)
Magyar (húngaro)
Nederlands (holandés)
Norsk (noruego)
Polski (polaco)
Português (Portugués de Portugal)
Português-Brasil (portugués de Brasil)
Română (rumano)
Русский (ruso)
Suomi (finés)
Svenska (sueco)
Türkçe (turco)
Tiếng Việt (vietnamita)
Українська (ucraniano)
Comunicar un error de traducción
Again, I apologise but I can't give permission for South London & Thameslink to be used.
Any future prospect for it at least?
I do have hope...
I really like your merges and I hope this maybe possible...
https://steamhost.cn/steamcommunity_com/sharedfiles/filedetails/?id=1298545317
and this one ?
https://steamhost.cn/steamcommunity_com/sharedfiles/filedetails/?id=916262914
South London Network+Chatham Mainline+London Faversham+Sheerness Branch+North London Line+MML+ECML+GEML+Mayflower Line (JT)
PS - I only do this stuff in my own time - I can't do everything but thank you for your feedback :). I know that you are eager to have as many merged routes as possible but I haven't done some for a reason as mentioned above. Don't worry though I am doing things and will show them when ready - won't say what so I don't get a is it done yet every 5 minutes from others ;) .
Notes -
1 + 3 - Also there is no reason to merge just Chatham Main Line to London to Brighton because there would be no use for it - I would merge South London Network in too because it covers Crystal Palace and other bits )
4 - A maybe - but i need to finish South London & Thameslink first. (also the issue of part set in 2010, another in 2012 and another in 2016 - not easy fixes to make )
5 & 6 - would need the bit from South London Network anyway because that bit covers East Croydon to London Bridge and Via Herne Hill too (Which London to Brighton doesn't have and I would have to rebuild from Scratch which there is no reason too)- as Covered by South London and Thameslink.
-----------------------------------------------------------------------------------------------------------------
1. to do - South London to Brighton with Chatham Mainline - As above + Chatham Mainline
2. to do - South London to Brighton with Chatham Mainline/Highspeed Line - As above + London to Faversham
3. to do - London to Brighton - London to Brighton + Chatham Mainline
4. to do - South London, Thameslink and Chatham Mainline - South London + Bedford Mainline + Chatham Mainline
5. to do London to Brighton and Thameslink - London to Brighton + Bedford Mainline
6. to do London to Brighton and Chatham Mainline - London to Brighton + Chatham Mainline
South London Merges
Routes already merged
-----------------------------------------------------------------------------------------------------------------
done - 2012/16 London Victoria & St Pancras to Faversham (& Sheerness) - Chatham Mainline + London to Faversham
done - South London to Brighton - South London Network + London to Brighton
done - South London and Thameslink - South London + Bedford Mainline
do you have the opportunity to merge Cologne - Dusseldorf, Cologne - Koblenz & Koblenz - Trier (Mosel Valley) sometime in the future?