Install Steam
login
|
language
简体中文 (Simplified Chinese)
繁體中文 (Traditional Chinese)
日本語 (Japanese)
한국어 (Korean)
ไทย (Thai)
Български (Bulgarian)
Čeština (Czech)
Dansk (Danish)
Deutsch (German)
Español - España (Spanish - Spain)
Español - Latinoamérica (Spanish - Latin America)
Ελληνικά (Greek)
Français (French)
Italiano (Italian)
Bahasa Indonesia (Indonesian)
Magyar (Hungarian)
Nederlands (Dutch)
Norsk (Norwegian)
Polski (Polish)
Português (Portuguese - Portugal)
Português - Brasil (Portuguese - Brazil)
Română (Romanian)
Русский (Russian)
Suomi (Finnish)
Svenska (Swedish)
Türkçe (Turkish)
Tiếng Việt (Vietnamese)
Українська (Ukrainian)
Report a translation problem
Again, I apologise but I can't give permission for South London & Thameslink to be used.
Any future prospect for it at least?
I do have hope...
I really like your merges and I hope this maybe possible...
https://steamhost.cn/steamcommunity_com/sharedfiles/filedetails/?id=1298545317
and this one ?
https://steamhost.cn/steamcommunity_com/sharedfiles/filedetails/?id=916262914
South London Network+Chatham Mainline+London Faversham+Sheerness Branch+North London Line+MML+ECML+GEML+Mayflower Line (JT)
PS - I only do this stuff in my own time - I can't do everything but thank you for your feedback :). I know that you are eager to have as many merged routes as possible but I haven't done some for a reason as mentioned above. Don't worry though I am doing things and will show them when ready - won't say what so I don't get a is it done yet every 5 minutes from others ;) .
Notes -
1 + 3 - Also there is no reason to merge just Chatham Main Line to London to Brighton because there would be no use for it - I would merge South London Network in too because it covers Crystal Palace and other bits )
4 - A maybe - but i need to finish South London & Thameslink first. (also the issue of part set in 2010, another in 2012 and another in 2016 - not easy fixes to make )
5 & 6 - would need the bit from South London Network anyway because that bit covers East Croydon to London Bridge and Via Herne Hill too (Which London to Brighton doesn't have and I would have to rebuild from Scratch which there is no reason too)- as Covered by South London and Thameslink.
-----------------------------------------------------------------------------------------------------------------
1. to do - South London to Brighton with Chatham Mainline - As above + Chatham Mainline
2. to do - South London to Brighton with Chatham Mainline/Highspeed Line - As above + London to Faversham
3. to do - London to Brighton - London to Brighton + Chatham Mainline
4. to do - South London, Thameslink and Chatham Mainline - South London + Bedford Mainline + Chatham Mainline
5. to do London to Brighton and Thameslink - London to Brighton + Bedford Mainline
6. to do London to Brighton and Chatham Mainline - London to Brighton + Chatham Mainline
South London Merges
Routes already merged
-----------------------------------------------------------------------------------------------------------------
done - 2012/16 London Victoria & St Pancras to Faversham (& Sheerness) - Chatham Mainline + London to Faversham
done - South London to Brighton - South London Network + London to Brighton
done - South London and Thameslink - South London + Bedford Mainline
do you have the opportunity to merge Cologne - Dusseldorf, Cologne - Koblenz & Koblenz - Trier (Mosel Valley) sometime in the future?